Supplying Power to the Real Futures Plantation

By 27/05/2022May 9th, 2025No Comments
Dwayne stabilizes the formwork

Our Carnarvon Community Development team does a great job with community engagement.

They help local churches, assist elderly residents with gardening and regularly work on the Real Futures Plantation.

Sean Challis’s excavator holding the power pole stable while we poor and set the cement. Without Sean’s excavator the Real Futures team would not of bean able to do the job ourselves

For the plantation to be operational, it needs an irrigation system to feed the fruit and vegetables we’ll be growing.

With a river close by, we can directly pump the water into our irrigation system. However, this needs a power supply!

Carnarvon Manager Sean Challis consulted with Horizon Power who recommended that a 9-metre power pole be installed.

Sean knew that the Real Futures team had the skills and equipment to get the job done themselves.

With the use of his personal excavator, the team were able to dig a 1.5 metre hole for the power pole to be placed in. They then used the excavator lifted the 200kg pole into place and cemented it there.

Well done to all involved!

Supervisor Dwayne stabilising power pole while it gets braced